AMR joined in the preservation of these iconic buildings at Historic Fort Snelling. This project was directly on the walking path of the main fort. Our professionals worked around hundred’s of tourists daily doing their best to limit disruption of their experience. Paint covering the stone sills had to be removed without damaging the stone or surrounding brick. The replacement bricks were custom made in three shades to match the building as needed.

Project Scope

  • Solid cut and tuckpointed 100% of the brick and stone
  • Installed the historic raised joint on the stone
  • Removed and replaced 2000+ individual bricks
  • Removed paint from the stone sills
  • Removed non-historic stairs and repaired stone and brick in the areas

Owner

Minnesota Historical Society

Category

Historical

Take a Close Look and See Why…

 

First of all, our professional staff is dedicated to added-value masonry corrective cleaning, repair and replacement, for brick, block, stone, pre-cast concrete, and other masonry materials. Therefore our staff makes AMR the recognized leader for masonry restoration.

Most noteworthy, we are a restoration firm with over 50 years of experience. Because each project is carefully planned before it is started by taking into consideration each job’s unique restoration needs. Finally, each step in the restoration process is designed and implemented in great detail to ensure the safety of our employees and to deliver a high quality project on time and within budget.